DSpace logo
Por favor, use este identificador para citar o enlazar este ítem: http://repositorio.ucsg.edu.ec/handle/3317/18400
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorPlaza Vera, Fernando Javier-
dc.contributor.authorSaltos Barzola, Jorge Andrés-
dc.date.accessioned2022-04-19T20:07:52Z-
dc.date.available2022-04-19T20:07:52Z-
dc.date.issued2022-03-11-
dc.identifier.urihttp://repositorio.ucsg.edu.ec/handle/3317/18400-
dc.descriptionEl presente proyecto tiene como objetivo realizar un análisis acerca del sistema pluvial del ramal B del Estero Salado luego de la instalación de una estructura de regulación, con la finalidad de evitar los eventos de inundaciones en la ciudad que ocurren frecuentemente durante la época invernal. Para la realización se utilizó el programa SWMM (Storm Water Management Model). Teniendo como base el Plan Maestro de Interagua. La modelación consistió en esquematizar el sistema actual con sus debidas condiciones y calcular los volúmenes de inundación con los periodos de retorno de 2, 5, 10 y 25 años; posteriormente, se realizó la simulación con la estructura implementada y conseguir los volúmenes de inundación bajo esta condición, en la cual se tuvo como resultado que los mismos serían menores gracias a la estructura implementada. Finalmente, se tiene que colectores ante periodos de lluvias de dos horas, su funcionamiento es ahogado llegando a un volumen de inundación de 72208.56 m3 bajo las condiciones actuales, mientras que, al instalar las válvulas Pinch controla el ingreso del agua por efecto de la marea evitando que estos colectores no funcionen de manera ahogada y que el volumen de inundación disminuya a 55538.56 m3, siendo este un 23% menor al volumen actual.en_US
dc.description.abstractThe present project has as principal objective the analysis about pluvial system from B branch of Estero Salado after the installation of regulation structure trying to avoid the flooding events that usually happen on winter season. For the process was necessary to use Storm Water Management Model software having as a principal information “Plan maestro” by Interagua. The simulation consist on modeling the actual pluvial system with all its conditions and flooding volumes calculus for the period return of 2, 5, 10 and 25 years. Then, the regulation structure was added to the system and get the new flooding volume having as a result that the collectors when the raining period is more than 2 hours, they works as full capacity reaching to 72208.56 m3 of flooding volumes, meanwhile, the system set Pinch valves, they both allow the right control of water from tide avoiding that the sumps work at full capacity decreasing the flooding volume to 55538.56 m3, comparing with the another one, this is 23 % less.en_US
dc.formatapplication/pdfen_US
dc.language.isospaen_US
dc.publisherUniversidad Católica de Santiago de Guayaquilen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/4.0/en_US
dc.subjectINGENIERÍA HIDRÁULICAen_US
dc.subjectDRENAJE FLUVIALen_US
dc.subjectCONTROL DE INUNDACIONESen_US
dc.subjectALCANTARILLADO SANITARIOen_US
dc.titleAnálisis hidráulico sobre la implementación de una estructura de regulación del ramal B del estero Salado de Guayaquil para la reducción de los riesgos de inundación en su cuenca de drenaje.en_US
dc.typeinfo:eu-repo/semantics/bachelorThesisen_US
Aparece en las colecciones: Trabajos de Titulación - Carrera de Ingeniería Civil

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
T-UCSG-PRE-ING-IC-434.pdf10,98 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons