DSpace logo
Por favor, use este identificador para citar o enlazar este ítem: http://repositorio.ucsg.edu.ec/handle/3317/19185
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorSuárez Murillo, Efraín Oswaldo-
dc.contributor.authorPaladines Lizondo, Jorge David-
dc.date.accessioned2022-10-05T16:27:03Z-
dc.date.available2022-10-05T16:27:03Z-
dc.date.issued2022-09-16-
dc.identifier.urihttp://repositorio.ucsg.edu.ec/handle/3317/19185-
dc.descriptionEl presente trabajo académico enfoca el análisis de energía desperdiciada en un sistema de aire comprimido industrial, las fugas de aire comprimido vienen a ser energía desperdiciada. El objetico principal es determinar fugas y averías del aire presurizado en las instalaciones de la planta, desde su etapa de generación hasta la red de distribución. La aportación de este análisis plantea un plan de mejoras para reducción de costos por fugas no detectadas en la instalación de aire presurizado. Las fugas no detectadas son problemas de mantenimiento en curso y pueden aparecer en cualquier parte del sistema. Estas fugas requieren un programa continuo de detección y reparación de fugas de aire. La metodología a emplear es bibliografía por la revisión técnica de los criterios de consumo (caudal, presión) de aire comprimido y de vacío. Se emplea el método analítico para realizar el levantamiento de equipos de generación y almacenamiento de aire presurizado en carga y vacío. Finalmente, el método comparativo que toma en cuenta la norma ISO 8573-1 que corresponde eficiencia energética del aire comprimido en la planta, por lo tanto, se pondera costos relacionados con consumo de caudal, de presión y de energía eléctrica.en_US
dc.description.abstractThis academic work focuses on the analysis of wasted energy in an industrial compressed air system, compressed air leaks become wasted energy. The main objective is to determine leaks and breakdowns of pressurized air in the plant facilities, from its generation stage to the distribution network. The contribution of this analysis proposes an improvement plan to reduce costs due to undetected leaks in the pressurized air installation. Undetected leaks are ongoing maintenance issues and can appear anywhere in the system. These leaks require an ongoing air leak detection and repair program. The methodology to be used is bibliography for the technical review of the consumption criteria (flow, pressure) of compressed air and vacuum. The analytical method is used to carry out the lifting of equipment for the generation and storage of pressurized air in load and empty. Finally, the comparative method that takes into account the ISO 8573-1 standard that corresponds to energy efficiency of compressed air in the plant, therefore, costs related to flow, pressure and electrical energy consumption are weighted.en_US
dc.formatapplication/pdfen_US
dc.language.isospaen_US
dc.publisherUniversidad Católica de Santiago de Guayaquilen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/4.0/en_US
dc.subjectMÁQUINAS ELÉCTRICASen_US
dc.subjectEFICIENCIA ENERGÉTICAen_US
dc.subjectRED DE DISTRIBUCIÓNen_US
dc.subjectAIRE PRESURIZADOen_US
dc.titleAnálisis de fugas en generación y distribución de aire comprimido en proceso industrial. Propuesta de plan de mejoras.en_US
dc.typeinfo:eu-repo/semantics/bachelorThesisen_US
Aparece en las colecciones: Trabajos de Titulación - Carrera de Ingeniería en Eléctrico-Mecánica

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
T-UCSG-PRE-TEC-IEM-311.pdf3 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons