![]() |
Please use this identifier to cite or link to this item:
http://repositorio.ucsg.edu.ec/handle/3317/27113Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.advisor | Bohórquez Heras, Daniel Bayardo | - |
| dc.contributor.advisor | Zamora Cedeño, Néstor Armando | - |
| dc.contributor.advisor | Bonilla Sánchez, Ronnie Alexander | - |
| dc.contributor.author | García Rivas, Rangel Abdías | - |
| dc.date.accessioned | 2026-11-09T20:24:50Z | - |
| dc.date.available | 2026-11-09T20:24:50Z | - |
| dc.date.issued | 2026-11-04 | - |
| dc.identifier.uri | http://repositorio.ucsg.edu.ec/handle/3317/27113 | - |
| dc.description | La Facultad de Arquitectura de la Universidad Católica de Santiago de Guayaquil presenta una alta dependencia del suministro eléctrico convencional y no dispone de un sistema de respaldo que asegure la continuidad de sus actividades académicas ante interrupciones de la red. En respuesta a esta necesidad, el estudio propone un sistema fotovoltaico interconectado con respaldo híbrido para cargas críticas. La metodología comprendió el levantamiento de la infraestructura eléctrica, la caracterización de la demanda, la evaluación del recurso solar, el dimensionamiento del arreglo y el análisis técnico-económico. La propuesta considera 318 módulos de 600 Wp, equivalentes a 190,8 kWp, instalados sobre una losa de 1.088 m² y distribuidos en 15 filas. La soportería requiere, como cantidades netas, 60 grapas finales, 606 grapas medias, 30 conectores de puesta a tierra, 666 grapas L, 150 rieles de aluminio de 6 m y 120 uniones de riel. El respaldo de la carga crítica se complementa con un inversor híbrido de 10 kW y 16 baterías de gel de 12 V y 200 Ah. Mediante el cálculo analítico se estima una producción de 260.740 kWh al año. Con una inversión preliminar de USD 126.989,36, el sistema generaría un ahorro bruto aproximado de USD 24.770,27 durante el primer año, alcanzando la recuperación de la inversión en 5,89 años, un valor actual neto de USD 63.669,69 y una tasa interna de retorno del 16,37 %. Los resultados indican que la propuesta es técnica y económicamente viable de manera preliminar; sin embargo, su implementación requiere validar el diseño estructural, la configuración de inversores, la generación energética y los precios definitivos mediante estudios de detalle y cotizaciones actualizadas. | en_US |
| dc.description.abstract | The Faculty of Architecture at the Universidad Católica de Santiago de Guayaquil relies heavily on the conventional power grid and lacks a backup system to ensure the continuity of academic activities during grid outages. To address this need, the study proposes a grid-tied photovoltaic system with hybrid backup for critical loads. The methodology involved surveying the electrical infrastructure, characterizing energy demand, assessing solar resources, sizing the array, and conducting a technical-economic analysis. The proposal entails installing 318 modules (600 Wp each, totaling 190.8 kWp) across a 1,088 m² slab, arranged in 15 rows. The mounting system requires—in net quantities—60 end clamps, 606 mid-clamps, 30 grounding connectors, 666 L-brackets, 150 aluminum rails (6 m), and 120 rail connectors. Critical load backup is provided by a 10 kW hybrid inverter and sixteen 12 V, 200 Ah gel batteries. Analytical calculations estimate an annual energy production of 260,740 kWh. With an initial investment of USD 126,989.36, the system would generate estimated gross savings of USD 24,770.27 in the first year, achieving a payback period of 5.89 years, a net present value of USD 63,669.69, and an internal rate of return of 16.37%. The results indicate that the proposal is technically and economically viable at a preliminary stage; however, implementation requires validating the structural design, inverter configuration, energy generation estimates, and final costs through detailed studies and updated price quotes. | en_US |
| dc.format | application/pdf | en_US |
| dc.language.iso | spa | en_US |
| dc.publisher | Universidad Católica de Santiago de Guayaquil | en_US |
| dc.rights | info:eu-repo/semantics/openAccess | en_US |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/4.0/ | en_US |
| dc.subject | Fuente de energía renovable | en_US |
| dc.subject | Energía solar fotovoltaica | en_US |
| dc.subject | Respaldo energético | en_US |
| dc.subject | Generación distribuida | en_US |
| dc.subject | Viabilidad económica | en_US |
| dc.title | Estudio de un sistema de energía renovable fotovoltaico para la Facultad de Arquitectura de la Universidad Católica de Santiago de Guayaquil. | en_US |
| dc.type | info:eu-repo/semantics/masterThesis | en_US |
| Appears in Collections: | Trabajos de Grado - Maestría en Electricidad | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| UCSG-C437-26556.pdf | 7,47 MB | Adobe PDF | View/Open |
This item is licensed under a Creative Commons License
