DSpace logo
Por favor, use este identificador para citar o enlazar este ítem: http://repositorio.ucsg.edu.ec/handle/3317/24645
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorUbilla González, Ricardo Xavier-
dc.contributor.authorHeras Sánchez, Segundo Luis-
dc.date.accessioned2025-05-09T20:49:35Z-
dc.date.available2025-05-09T20:49:35Z-
dc.date.issued2024-09-04-
dc.identifier.urihttp://repositorio.ucsg.edu.ec/handle/3317/24645-
dc.descriptionEl hotel manament ubicado en playas se dedica a brindar servicios hoteleros, sin embargo, desde el periodo 2023 hasta el 2024 aun no cuenta con un sistema de medición y respaldo, por tanto se realizó un diagnóstico de las instalaciones donde, en el levantamiento de información reveló que la demanda total de energía del hotel es de 125.46 kW, distribuida en 3 paneles por piso y un panel de servicios generales. Sin embargo, el hotel carece de un sistema de medición debido a la falta de un diseño eléctrico aprobado por la empresa eléctrica. Durante la etapa de diseño, se determinó que el hotel necesita un sistema de medición compuesto por dos subsistemas: uno de medición semi indirecta CL-20, ubicado en un monolito a la salida del transformador con un transformador de corriente multi radio 600/400:5, y otro compuesto por un tablero de medidores TM-4 BI, que alojará 4 medidores CL 200 con su protección correspondiente, ubicados en el cuarto eléctrico.El presupuesto eléctrico para el sistema de medición del hotel es de 5605.75 dólares, con un 52% destinado al suministro eléctrico y un 48% a los servicios y gestión del proyecto. Se propuso un plazo de 60 días para desarrollar estas soluciones, divididos en 30 días para el rediseño y gestión del proyecto, y 30 días para el suministro e instalación de los componentes eléctricos.en_US
dc.description.abstractThe manament hotel located in beaches is dedicated to providing hotel services, however, from the period 2023 to 2024 it still does not have a measurement and support system, therefore a diagnosis of the facilities was carried out where, in the collection of information revealed that the hotel's total energy demand is 125.46 kW, distributed in 3 panels per floor and a general services panel. However, the hotel lacks a metering system due to the lack of an electrical design approved by the power company. During the design stage, it was determined that the hotel needs a measurement system composed of two subsystems: one for semi-indirect measurement CL-20, located in a monolith at the output of the transformer with a 600/400 multi-radius current transformer: 5, and another composed of a TM-4 BI meter panel, which will house 4 CL 200 meters with their corresponding protection, located in the electrical room. The electrical budget for the hotel's metering system is 5605.75 dollars, with a 52 % allocated to electricity supply and 48% to services and project management. A period of 60 days was proposed to develop these solutions, divided into 30 days for the redesign and management of the project, and 30 days for the supply and installation of the electrical components.en_US
dc.formatapplication/pdfen_US
dc.language.isospaen_US
dc.publisherUniversidad Católica de Santiago de Guayaquilen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/4.0/en_US
dc.subjectDISTRIBUCIÓN ELÉCTRICAen_US
dc.subjectSISTEMA ELÉCTRICOen_US
dc.subjectMEDIDAS DE SEGURIDADen_US
dc.subjectSISTEMA DE DISTRIBUCIÓNen_US
dc.subjectCALIDAD DE ENERGÍAen_US
dc.subjectEFICIENCIA ENERGÉTICAen_US
dc.titleEstudio eléctrico para el Hotel Management en media y baja tensión con sistema de respaldo de energía AC.en_US
dc.typeinfo:eu-repo/semantics/bachelorThesisen_US
Aparece en las colecciones: Trabajos de Titulación - Carrera de Ingeniería en Electricidad

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
UCSG-C432-24239.pdf3,01 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons