![]() |
Por favor, use este identificador para citar o enlazar este ítem:
http://repositorio.ucsg.edu.ec/handle/3317/26818Registro completo de metadatos
| Campo DC | Valor | Lengua/Idioma |
|---|---|---|
| dc.contributor.advisor | Mero Vallas, Alexander Ronald | - |
| dc.contributor.author | Solórzano Ibarra, Jordy Ivar | - |
| dc.contributor.author | Yagual Lázaro, William Hernán | - |
| dc.date.accessioned | 2026-09-23T17:04:41Z | - |
| dc.date.available | 2026-09-23T17:04:41Z | - |
| dc.date.issued | 2024-08-21 | - |
| dc.identifier.uri | http://repositorio.ucsg.edu.ec/handle/3317/26818 | - |
| dc.description | La presente investigación se desarrolló siguiendo el objetivo de proponer el diseño de un sistema de automatización de reconectadores a nivel de 13.8 kV en la vía a Posorja, subestación Playas, Ecuador. Para lograr esto se utilizó una metodología que empleó la revisión bibliográfica, diagnóstico del sistema actual, diseño del sistema de automatización. En el análisis de red de distribución de la subestación, se identificaron 5 abastecedores, donde el denominado Interconexión Playas mostró puntuaciones elevadas en los indicadores FMIK y TTIK, siendo este el punto de trabajo para realizar la arquitectura del sistema de automatización. Se eligieron tres puntos estratégicos en la vía a Posorja para la ubicación de los reconectadores automáticos, cajas de control y sistema de comunicación, del mismo modo se elaboró la arquitectura para realizar el control y supervisión desde la estación de trabajo. Se concluye que el actualizar el sistema de distribución de energía ayuda a mejorar el servicio de electricidad para garantizar la satisfacción de los usuarios. | en_US |
| dc.description.abstract | The present investigation was developed following the objective of proposing the design of a recloser automation system at a level of 13.8 kV on the road to Posorja, Playas substation, Ecuador. To achieve this, a methodology was used that used bibliographic review, diagnosis of the current system, automation system design. In the analysis of the substation distribution network, 5 suppliers are identified, where the so-called Playas Interconnection showed a decrease in the FMIK and TTIK indicators, this being the work point to carry out the architecture of the automation system. Three strategic points on the road to Posorja were chosen for the location of the automatic reclosers, control boxes and communication system, in the same way the architecture was developed to carry out control and supervision from the workstation. It is concluded that updating the energy distribution system helps improve the electricity service to guarantee user satisfaction. | en_US |
| dc.format | application/pdf | en_US |
| dc.language.iso | spa | en_US |
| dc.publisher | Universidad Católica de Santiago de Guayaquil | en_US |
| dc.rights | info:eu-repo/semantics/openAccess | en_US |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/4.0/ | en_US |
| dc.subject | Redes de media tensión | en_US |
| dc.subject | Subestación eléctrica | en_US |
| dc.subject | Calidad del suministro eléctrico | en_US |
| dc.subject | Instalación eléctrica | en_US |
| dc.title | Propuesta diseño de un sistema de automatización de reconectadores a nivel 13.8kv en la vía a Posorja, subestación Playas, Ecuador. | en_US |
| dc.type | info:eu-repo/semantics/bachelorThesis | en_US |
| Aparece en las colecciones: | Trabajos de Titulación - Carrera de Ingeniería en Electricidad | |
Ficheros en este ítem:
| Fichero | Descripción | Tamaño | Formato | |
|---|---|---|---|---|
| UCSG-C432-26277.pdf | 3,44 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons
